36
Note: when use O2 as the plasma shield gas, have to connect air into the manual gas console, to get
suitable mix gas.
① Copper pipe or suitable soft hose can be used in gas supply system, but don’t use steel
pipe or aluminium pipe.
② After gas hose installation, test the system with high pressure to check if gas leakage.
③ The suggested hose inner diameter that connect with manual gas console is 9.5
~
10mm.
④ For hose system, please use special inert gas hose for Air, Ne and Ar.
V.
Operation
1. Inspection before start
Before start the machine everyday,make sure cutting surrounding environment and
protective suit meet requirements according to “safety” of this manual,and have to check
again as follow steps.
Plasma torch checking
WARNING
Before operation,please read carefully “safety” chapter.
Turn off power before operate the following.
1)
Turn off the power of contribution box,and cut the power switch of the plasma
power source.
2)
Take down consumables from plasma torch and check if there is some wearing or
damage.
Please put all consumables on clean,dry and non-oil place. Dirty
consumables hurt the plasma torch.
3)
If any consumables damage,replace it.
4)
After installing consumables,make sure torch and work-piece keep vertical.
2. Plasma power source (machine) operation
1)
Power switch of plasma power source (machine)
Plasma cutting machine power, manual gas console and HF box power supply are all
controlled by the emergency stop switch on cutting machine panel, turn it clockwise is ON,
press is OFF.
Summary of Contents for FLG-200HD
Page 9: ...5 Figure 2 1 System connection diagram ...
Page 43: ...39 Figure 5 2 SQK A1 front panel function Figure 5 3 SQK B1 front panel function ...
Page 74: ...70 4 System wiring diagram Figure 7 1 System wiring diagram ...
Page 77: ...73 2 Main circuit wiring diagram 2 Figure 7 4 FLG 200HD Main circuit wiring diagram 2 ...
Page 81: ...77 6 HF striking diagram Figure 7 8 HF striking diagram ...