2-30
Setting Up the Detector
Lamp on/off connections
To make lamp on/off connections:
1. Make the lamp on/off connections shown in the following table and
figure with a signal cable.
2. Configure the lamp on/off signal at the detector’s front panel by
changing the default from Ignore to High or Low (see
).
3. Using the signal cable, make the lamp on/off connections from the pump
controller to the detector shown in the following table and figure.
Lamp on/off connections for the 600-series pump
Detector inputs and 600-series pump terminal connections
600-series pump terminal
2475 detector (A inputs)
S1, S2, S3, or S4
Pin 4 Lamp On/Off +
GND (any one of four)
Pin 5 Lamp On/Off –
INJECT
ST
OP
FLOW
HOLD
S1
S2
S3
S4
SWITCHES
CHART
+
PRESSURE
+
CHART
_
PRESSURE
_
GND
GND
GND
GND
AUX.
+
12V
2475 detector
A (inputs and outputs)
600-series pump
1
2
3
4
5
6
7
8
9
10
+
−
+
−
+
−
+
−
Inject start 1
Inject start 1
Ground
Lamp on/off
Lamp on/off
Chart mark
Chart mark
Ground
Auto zero
Auto zero
Red
Black
Summary of Contents for 2475
Page 14: ...xiv Table of Contents...
Page 158: ...4 16 Maintenance Procedures...
Page 182: ...5 24 Error Messages Diagnostic Tests and Troubleshooting...
Page 196: ...A 14 Safety Advisories...
Page 200: ...B 4 Specifications...
Page 214: ...C 14 Solvent Considerations...
Page 228: ...Index 14...