Preparing for Empower 2 operation
4-15
Preparing for Empower 2 operation
Use this section to ready the 1500-series pump for performing runs under
Empower 2 software control. It describes simple techniques for accomplishing
these tasks:
•
Priming and purging the pump
•
Purging the system
•
Equilibrating the system
For additional information and instructions on setting up the HPLC system
and creating methods, see the Empower 2 online Help.
For software-release-specific details, see the release notes for the Waters
1500-series pumps and the Waters Empower 2 software.
Power-on the pump and other chromatographic system devices before you
power-on the Empower 2 system workstation, and start the Empower 2
application (see
Priming and purging the pump via Empower 2 control
You must prime and purge the pump to ensure its proper operation (see
).
Before priming and purging the pump
•
If the pump is dry, dry prime it before proceeding (see
•
Ensure the eluent flow is directed to waste—bypassing any connected
components downstream of the pump—by turning the pump’s reference
valve knob 1/2-turn to the right (for the 1525µ pump, position the vent
valve knob to Vent).
To prime and purge the pump:
1. At the Empower 2 workstation, log in to Empower 2.
2. In the Navigation pane, click Configure System to display the
Configuration Manager window.
3. Select Systems, and verify that your chromatographic system with a
1500-series pump is configured and online.
Summary of Contents for 1500-Series
Page 14: ...xiv Table of Contents ...
Page 32: ...1 18 Introduction ...
Page 50: ...2 18 Installing the HPLC Pump ...
Page 84: ...3 34 Installing Options and Accessories ...
Page 108: ...4 24 Preparing for Operation ...
Page 160: ...A 14 Safety Advisories ...
Page 184: ...C 16 Solvent Considerations ...