WL2FL
Manual
Page 48 – Revision AUS-04-23
Always install indoors and place the
Waterlogic WL2FL Water Treatment System
on a firm, flat and
stable surface.
1. Attach the water supply line to the 1/4” feed water inlet bulkhead fitting on the back of the unit.
Waterlogic
requires the use of a water pressure regulator. Water feed pressure must be
between 2.7-4bar. Turn on the water supply and check for leaks.
2. Check to ensure that the Red Compressor & Heater switch is the
O=OFF
position.
NOTE:
Switch has internal LED that illuminates when placed in
I=ON
position.
3. Connect the power cord to the back of the
Waterlogic WL2FL Water Treatment System
and toa
220/240 Volt supply.
4. Fill the Cold Tank. Hold a container under the dispensing faucet, press and hold the main
dispensing button until a continuous flow of water is obtained. Once a continuous flow is
obtained, release the dispensing button. Cold Tank is now full.
5. Fill the Hot Tank. Hold a container under the dispensing faucet. Press the Hot Select Button
followed by the main dispensing button until a continuous flow of water is obtained. Once a
continuous flow is obtained, release the main dispensing button. Hot tank is now full.
CAUTION!
NEVER TURN ON HEATER BEFORE FILLING HOT TANK.
Red Compressor/Heater Switch must be in the O=OFF position while the hot
tank is empty. Damage could occur within one minute and the overheat (high
limit) will require manual reset if heater is turned on with an empty hot tank.
6. Verify that the UV lamp operates as expected.
WARNING!
ULTRAVIOLET RADIATION.
Protect your skin and eyes against ultraviolet rays.
Never look directly at an operating UV light. Always disconnect before removal.
7. Move the
Waterlogic WL2FL Water Treatment System
into its final operating position. Be sure
that a minimum of 50mm clearance is maintained around both the sides and the back of the unit.
This is important to allow proper airflow and heat exchange of refrigeration system.
8. Level unit using the adjustable feet to level if necessary. Never install on incline.
9. Turn the Red Compressor & Heater Power Switch to
I=ON
position.
10. When the unit has reached its Hot Temp Set Point, the heater will cycle off.
When the unit has reached its Cold Temp Set Point Temperature, the compressor will cycle off.
11. Once the unit is at the target temperature(s), sample the water to ensure water meets
expectations and additional rinsing or adjustment is not required.
12. Check the
WL2FL Water Treatment System
for any leaks. External Leak Protection is always
recommended.
Summary of Contents for PUREZZA WL2FL FIREWALL
Page 1: ...WL2FL FIREWALL MANUAL...
Page 15: ...WL2FL Manual Page 15 Revision AU27 04 2023 HEATER CIRCUIT HOT TANK WIRING...
Page 21: ...WL2FL Manual Page 21 Revision AU27 04 2023 WL2FL MINI DRAWING AND PARTS LIST...
Page 26: ...WL2FL Manual Page 26 Revision AU27 04 2023 WL2FL FREE STANDING DRAWING AND PARTS LIST...
Page 32: ...WL2FL Manual Page 32 Revision AU27 04 2023 WL2FL FLOW DIAGRAM COLD ONLY...
Page 33: ...WL2FL Manual Page 33 Revision AU27 04 2023 COLD AND AMBIENT...
Page 34: ...WL2FL Manual Page 34 Revision AU27 04 2023 HOT AND COLD...
Page 36: ...WL2FL Manual Page 36 Revision AU27 04 2023...
Page 37: ...WL2FL Manual Page 37 Revision AU27 04 2023 120V 60Hz Power Source 120V 60Hz 120V 60Hz...
Page 38: ...Power Source 120V 60Hz 120V 60Hz 120V 60Hz WL2FL Manual Page 40 Revision EU07 07 17...