
SA FET Y INSTRUC TIONS FOR R E PAIRS
224
Before performing welding work on the loader
•
Disconnect the battery as described in this Operator’s
Manual.
•
Disconnect the positive pole (terminal B+) on the gen-
erator.
•
Switch OFF the battery disconnect switch (if present).
•
Protect bare terminals and connections against short-
circuiting.
•
Attach the welding grounding terminal in the immedi-
ate vicinity of the welding site. Do not allow the welding
current to pass through gears, bolts, articulated joints
or hydraulic cylinders.
After welding has been completed:
•
Reconnect all the electrical connections and check that
they function.
•
Connect the battery as described in this Operator’s
Manual.
Summary of Contents for WL 30
Page 1: ...www wackerneuson com Operator s Manual Wheel Loader WL 30...
Page 2: ...December 10 Edition...
Page 17: ...BASIC INFORMATION 15 WL30...
Page 48: ...TECHNICAL DATA 46 3 4 Dimensions Fig 11 Dimensions...
Page 61: ...Description of the indicator warning and control elements 59 WL30...
Page 126: ...Towing and transporting 124 Fig 58 Tying down the loader...
Page 161: ...SERVICING AND INSPECTION 159 WL30 2 1 Fig 63 Cab tilt lever...
Page 235: ...Appendix 233 WL30 For personal notes...
Page 245: ...List of figures 243 WL30...