
SE RvICINg A ND INSPEC TION
147
W L 30
Work to be performed
Operating hours:
250, 750, 1000,
1250, 1750,
2000, 2250,
2750, 3000, etc.
Operating
hours: 1500,
2500, 3500,
4500, etc.
monthly
annually
Check the lighting system – (if present)
x
x
x
x
Check the exhaust system
x
x
Check the hinge pins and joint bushings
x
x
Check the center pivot bolts and bearings
x
x
Check the pressure relief valves in the hydraulic system
x
x
Check the idle speed
x
x
x
x
Check max. speed when loaded and unloaded
x
x
Check the starter and alternator (engine manual)
x
x
Check the heater plugs and fuel injectors (engine manual)
x
x
Check the valve clearance, adjust if necessary
x
For Deutz engines: Check the timing belt for engine timing and, if avail-
able, for auxiliary drive system (do not retighten, change every 5 years or
after 4500 op. hours)
x
x
Check the fuel injectors (every 3000 operating hours)
Check the functioning of the engine enclosure locking mechanism, adjust
if necessary
x
x
x
x
Summary of Contents for WL 30
Page 1: ...www wackerneuson com Operator s Manual Wheel Loader WL 30...
Page 2: ...December 10 Edition...
Page 17: ...BASIC INFORMATION 15 WL30...
Page 48: ...TECHNICAL DATA 46 3 4 Dimensions Fig 11 Dimensions...
Page 61: ...Description of the indicator warning and control elements 59 WL30...
Page 126: ...Towing and transporting 124 Fig 58 Tying down the loader...
Page 161: ...SERVICING AND INSPECTION 159 WL30 2 1 Fig 63 Cab tilt lever...
Page 235: ...Appendix 233 WL30 For personal notes...
Page 245: ...List of figures 243 WL30...