
SE RvICINg A ND INSPEC TION
201
W L 30
1. Stop the loader on a horizontal surface with a hard foun-
dation and set the parking brake.
2. Lower the Loader lift arms and attachment to the ground
or work surface.
3. Stop the engine.
4. Position the jack under the axle next to the wheel to
be changed. Make sure that the loader cannot slip off
the jack.
5. Loosen the wheel bolts.
6. Raise the jack just high enough so that the wheel does
not touch the ground.
7. Remove the wheel bolts and the wheel.
8. Install the new wheel and the wheel bolts.
9. Tighten the wheel bolts.
10. Lower the jack.
11. Alternately tighten the wheel bolts opposite each other
to the specified tightening torque.
Summary of Contents for WL 30
Page 1: ...www wackerneuson com Operator s Manual Wheel Loader WL 30...
Page 2: ...December 10 Edition...
Page 17: ...BASIC INFORMATION 15 WL30...
Page 48: ...TECHNICAL DATA 46 3 4 Dimensions Fig 11 Dimensions...
Page 61: ...Description of the indicator warning and control elements 59 WL30...
Page 126: ...Towing and transporting 124 Fig 58 Tying down the loader...
Page 161: ...SERVICING AND INSPECTION 159 WL30 2 1 Fig 63 Cab tilt lever...
Page 235: ...Appendix 233 WL30 For personal notes...
Page 245: ...List of figures 243 WL30...