38
Completing fixing
Fig. 24
After connection, it is possible to attach equipment to the wall-mounted steel plate.
Fig. 25
Equipment should be hooked to the plate, first inserting the two steel fins set at the bottom.
Fig. 26
Complete equipment fixing by pushing it completely against the wall plate and locking it into the upper side by means of
the two corresponding screws.
Fig. 27-28
After having fixed equipment, you need to fix the air vent provided for ventilation channel closure on the outside (Fig. 39).
The air vent is supplied assembled, so therefore unscrew the two screws on the air vent cover to proceed with operations.
To secure the air vent, similarly to the instructions provided above for the plate, simply set it and centre it over the inserted
pipe, mark holes and drill.
Provided fixing screws
4
Ø Expected dowel diam.
6 mm
24
24
25
25
A
B
26
26
C
D
28
28
27
27
ENGLISH
Summary of Contents for VORT VDH 60 HP MONO
Page 3: ...Vortice ZH 104 104 105 107 108 110 116 117 124 125 127...
Page 104: ...104 VMC 1 2 3 1 1 2 2 3 3...
Page 105: ...105 4 Vortice P 4 4...
Page 106: ...106 HFC R134a...
Page 108: ...108 5 5 1 2 3 4 5 6 7 8 9 10 11 12 150mm 13 14 15...
Page 112: ...112 16 17 18 24 T P I 19 20 21 22 23 16 16 17 17 19 19 20 20 21 21 22 22 23 23 P P...
Page 113: ...113 24 25 26 27 28 4 6 mm 24 24 25 25 A B 26 26 C D 28 28 27 27...
Page 114: ...114 29 30 31 32 29 29 30 30 Max 150 mm 31 31 32 32...
Page 115: ...115 33 34 35 36 37 36 36 2 37 37 E F 1 35 35...
Page 117: ...117 A B 1 2 3 4 5 6 NIGHT NIGHT OFF F A B F F NIGHT 25 01 18 08 07...
Page 125: ...125 41 42 10cm 43 USB 42 42 10 cm...
Page 126: ...126 44 45 46 3 44 44 45 45 46 46 VCC A B GND...
Page 127: ...127 47 48 47 47 VCC A B GND VCC A B GND 48 48...
Page 128: ...128 49 50 51 52 53 49 49 50 50 51 51 52 52 53 53...
Page 131: ...131 Note...
Page 132: ...Note...
Page 133: ......