Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
– When raising and lowering engine, make sure that neither
vacuum hose -1- nor connection -2- on vacuum pump are
damaged.
– Guide vacuum hose -1-, connection -2- and vacuum pump
past plenum chamber when raising and lowering.
– When raising and lowering engine, make sure that rollers of
belt drive and turbocharger do not damage radiator.
– When raising and lowering engine, pay attention to lines and
hoses to prevent these from being damaged.
– Check whether dowel sleeves for centering engine/gearbox
are in cylinder block, install if necessary (gearbox removed).
– Check clutch release bearing for wear and, if necessary, re‐
place (gearbox removed).
Caution
• Bring engine and gearbox together in longitudinal direc‐
tion, not at an incline.
• When bringing engine and gearbox together, make sure
that needle bearing -arrow- is not damaged.
– First tighten the two upper bolts -1-.
Note
♦
Specified torques for assembly mountings
.
♦
Electrical connections and routing ⇒ Electrical system; Rep.
gr. 97 .
Amarok 2011 ➤
4-cylinder injection engine (2.0 l direct injection engine, turbocharger) - Edition 02.2011
1. Removing and installing engine
15