Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
1 - Turbocharger
❑ Can only be renewed to‐
gether with exhaust
manifold and vacuum
unit as one unit
❑ Removing and installing
.
2 - Hose
3 - Vacuum unit for turbocharg‐
er
❑ Can only be renewed to‐
gether with turbocharg‐
er.
4 - Hose clip
5 - Hose
6 - Hose
7 - Bolt
❑ 3 Nm
8 - Charge pressure control
solenoid valve -N75-
9 - Hose
10 - Turbocharger air recircu‐
lation valve -N249-
❑ Note installation posi‐
11 - Bolt
❑ 7 Nm
12 - O-ring
❑ Renew.
13 - O-ring
❑ Renew.
14 - Connection
15 - Bolt
❑ 9 Nm
Installation location of turbocharger air recirculation valve -N249-
– Note installation position -arrows-.
Amarok 2011 ➤
4-cylinder injection engine (2.0 l direct injection engine, turbocharger) - Edition 02.2011
2. Turbocharger
193