Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
– Remove 2 bolts -arrows-.
– Carefully pull out high-pressure fuel pump. Sleeve can remain
inserted in vacuum pump.
Installing
– Renew high-pressure pump O-ring.
– Insert roller tappet in vacuum pump (first check roller tappet
for damage).
Note
♦
Roller tappet must be at bottom dead centre to enable high-
pressure pump to be installed.
♦
If same or a used high-pressure pump is installed, connection
for fuel pressurisation line (high-pressure side) must be re‐
newed. See assembly overview - high-pressure pump item 11
– Turn crankshaft until roller tappet is at bottom dead centre.
– Insert high-pressure pump into vacuum pump and tighten.
– Tighten bolts hand tight.
– Renew high-pressure pump connection.
• Specified torque: assembly overview - high-pressure pump
– Now tighten bolts in diagonal sequence to specified torque,
see assembly overview - high-pressure pump
– Tighten union nut of high-pressure line hand-tight. Align free
of tension.
• Specified torque for fuel pressurisation line (union nut): as‐
sembly overview - intake manifold
.
– Reattach connector to fuel pressure regulating valve -N276-
-1-.
– Put back fuse if it has been removed.
Note
Check fuel system for leaks.
2.17
Removing and installing engine control
unit
Special tools and workshop equipment required
Amarok 2011 ➤
4-cylinder injection engine (2.0 l direct injection engine, turbocharger) - Edition 02.2011
2. Injection system
227