Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
– Tighten new bolts -1- for left engine mounting -A-.
– Tighten new bolts -1- for right engine mounting -A-.
– Install catalytic converter
– Install air conditioner compressor ⇒ Heating, air conditioning;
Rep. gr. 87 .
– Install vane pump for power steering ⇒ Running gear, axles,
steering; Rep. gr. 48 ; Removing and installing vane pump .
– Install starter ⇒ Electrical system; Rep. gr. 27 ; Removing and
installing starter .
– Fit engine guard, if available ⇒ Body, front; Rep. gr. 50 ; En‐
gine guard .
– Install bonnet ⇒ General body repairs, exterior; Rep. gr. 55 ;
Bonnet .
– Fit new screw-type clips with „barb“, notes on screw-type clips
.
To prevent the high-pressure pump from running while it is empty
and to ensure that the engine starts quickly after parts have been
renewed, it is important to observe the following:
♦ If components of fuel system between fuel tank and high-pres‐
sure pump are removed or renewed, „Bleeding fuel system“
function must be carried out to bleed fuel system using vehicle
diagnosis tester in „Guided Functions“
.
♦ This process takes 130 seconds. Fuel pumps are actuated a
total of 3 times in this case. The process must not be termi‐
nated prematurely.
– Check oil level
.
Note
♦
Only reuse drained coolant if neither cylinder head nor cylinder
block have been renewed.
♦
Soiled coolant must not be reused.
– Carry out road test and read fault memory.
Specified torques
Amarok 2011 ➤
4-cylinder injection engine (2.0 l direct injection engine, turbocharger) - Edition 02.2011
16
Rep. gr.10 - Removing and installing engine