Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
– Connect charge air system tester -V.A.G 1687- to compressed
air -1- via commercial adapter.
Note
If there is water in inspection glass, drain via drain screw -6-.
– Open valve -3-.
Caution
Risk of damage because pressure is set too high.
♦ The pressure must not exceed 0.5 bar!
– Adjust pressure to 0.5 bar with pressure control valve -2-.
– Open valve -4- and wait until test circuit is full. If necessary,
readjust pressure to 0.5 bar.
– Check charge air system for leaks by hearing, touching, with
commercially available leak detector spray or using ultrasonic
tester -V.A.G 1842- .
Note
♦
A small amount of air escapes through the valves and enters
the engine. Therefore a holding pressure test is not possible.
♦
How to use the ultrasonic tester -V.A.G 1842- ⇒ operating
instructions
♦
Before removing the adapters, depressurise the test circuit by
detaching coupling.
♦
Hose unions and air pipes/hoses must be free of oil and grease
when installing.
♦
Secure all hose connections with hose clips corresponding to
the series equipment ⇒ Electronic parts catalogue .
♦
In order to be able to securely attach the air ducts on their
connections, the screws of the used hose clips have to be
sprayed with penetrating spray before installing.
Amarok 2011 ➤
4-cylinder injection engine (2.0 l direct injection engine, turbocharger) - Edition 02.2011
1. Charge air system
191