Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
♦ Drip tray for workshop hoist
-VAS 6208-
♦ Step -VAS 6292/4-
♦ Hose clip pliers -VAS 6340-
♦ Hose clip pliers -VAS 6362-
♦ Retainer -T10014-
♦ High-temperature grease -
G 052 133 A2-
♦ Cable ties
♦ Square timber 10 x 30 x 10
cm
Procedure
Note
♦
Before carrying out further work, remove the battery. Check
whether a coded radio is fitted. Obtain anti-theft coding be‐
forehand if necessary.
♦
The engine is removed upwards.
♦
The gearbox remains installed.
♦
All cable ties that are opened or cut through when the engine
is removed must be renewed/replaced in the same position
when the engine is installed.
♦
Seal open lines and unions with clean plugs from engine bung
set -VAS 6122- .
♦
Collect drained coolant in a clean container for re-use or dis‐
posal.
Amarok 2011 ➤
4-cylinder injection engine (2.0 l direct injection engine, turbocharger) - Edition 02.2011
1. Removing and installing engine
5