P118F Series Service Manual
INDEX
1/6/09
12-3
Thawing, Timer (T)--------------------------------------------6-2, 9-10
Thermostat, Bin Installation---------------------------------------3-12
Thermostat, Wiring--------------------------------------------------3-12
Timer, Thawing ------------------------------------------------6-2, 9-10
Trap (AC Piping)------------------------------------------------------ 3-9
Troubleshooting------------------------------------------------------- 8-1
Troubleshooting, Power Monitor ------------------------------ 10-20
Troubleshooting, Soft-start Motor Controller --------------- 10-16
U
Unloader - Loaded Operation (Freeze Period) --------------9-14
V
Vitals, Operation -----------------------------------------------------11-6
W
Warranty (Basic Product) ----------------------- inside back cover
Water Conditioning -------------------------------------------------- 3-1
Water Cooled Condenser ------------------------------------ 3-1, 7-2
Water Cooled Condenser Cleaning ----------------------------- 7-2
Water cooled Machine, Installation ------------------------------ 3-1
Water Cooled Piping Schematic --------------------------------- 4-3
Water Cooled Units -------------------------------------------------- 9-5
Water Distributors ---------------------------------------------------- 7-2
Water Pump Motor --------------------------------------------------9-13
Water Quality ---------------------------------------------------------- 3-1
Water Regulating Valve -------------------------------------------- 9-5
Water Supply and Drain, Water Cooled ----------------- 3-1, 3-2
Water Supply and Drains, Air-cooled --------------------- 3-1, 3-3
Water Tank------------------------------------------------------------- 7-2
Water Tank Removal -----------------------------------------------9-16
Water Usage, Condenser -----------------------------------------11-5
Water Usage, Make-up --------------------------------------------11-5
Wiring and Electrical Connection -------------------------------- 3-4
Wiring Schematic , Air Cooled Condenser -------------------3-11
Wiring Schematic, All Voltages - 50/60 Hz -------------------- 6-3
X
X Valve ----------------------------------------------------------------- 4-2
Y, Z
Summary of Contents for TUBE-ICE P-118F
Page 1: ...P 118F TUBE ICE MACHINE Service Manual 5000 1 6 09 ...
Page 4: ......
Page 6: ......
Page 14: ...P118F Service Manual INTRODUCTION 1 6 09 1 4 FIGURE 1 1 Assembly Air Cooled Front View ...
Page 15: ...P118F Service Manual INTRODUCTION 1 6 09 1 5 FIGURE 1 2 Assembly Air Cooled Rear View ...
Page 16: ...P118F Service Manual INTRODUCTION 1 6 09 1 6 FIGURE 1 3 Assembly Air Cooled Right Side View ...
Page 17: ...P118F Service Manual INTRODUCTION 1 6 09 1 7 FIGURE 1 4 Assembly Water Cooled Front View ...
Page 18: ...P118F Service Manual INTRODUCTION 1 6 09 1 8 FIGURE 1 5 Assembly Water Cooled Rear View ...
Page 19: ...P118F Service Manual INTRODUCTION 1 6 09 1 9 FIGURE 1 6 Assembly Water Cooled Right Side View ...
Page 20: ...P118F Service Manual INTRODUCTION 1 6 09 1 10 ...
Page 23: ...P118F Service Manual RECEIPT OF YOUR TUBE ICE MACHINE 1 6 09 2 3 ...
Page 37: ......
Page 38: ...1 6 09 ...
Page 48: ......
Page 49: ...1 6 09 ...
Page 88: ...P118F Service Manual SERVICE OPERATIONS 1 6 09 9 18 FIGURE 9 8 Cutter Water Tank Assembly ...
Page 89: ...P118F Service Manual SERVICE OPERATIONS 1 6 09 9 19 FIGURE 9 9 Cutter Tank Parts cylinder ice ...
Page 90: ...P118F Service Manual SERVICE OPERATIONS 1 6 09 9 20 FIGURE 9 10 Cutter Drive Parts ...
Page 102: ...P118F Service Manual TABLES CHARTS 1 6 09 11 1 11 Tables Charts ...
Page 111: ...P118F Service Manual TABLES CHARTS 1 6 09 11 10 ...