P118F Service Manual
INDEX
1/6/09
12-2
H
Hand Expansion Valve---------------------------------------------- 9-2
Harvest Period -------------------------------------------------------- 4-2
Head Pressure -------------------------------------------------------- 9-5
Heat Exchanger------------------------------------------------------- 4-1
Heater, Crankcase --------------------------------------------------- 9-5
High Head Pressure (Air-Cooled) -------------------------------8-10
High Head Pressure (Water Cooled)---------------------------- 8-9
High/Low Pressure Switch ----------------------------------------- 9-4
History, Tube-Ice® --------------------------------------------------- 1-1
Hub, Cutter Drive Gear --------------------------------------------9-20
I
Ice Bin Thermostat Location--------------------------------------3-12
Ice Capacity ----------------------------------------------------------11-4
Ice-Making Section -------------------------------------------------- 7-1
Important Safety Notice--------------------------------------------- 1-2
Inspection, First Arrival --------------------------------------------- 2-1
Installation-------------------------------------------------------------- 3-1
Installation Review: A Checklist --------------------------------3-13
Introduction ------------------------------------------------------------ 1-1
J, K
L
Low Compressor Oil Level----------------------------------------- 8-7
Low Ice Capacity ----------------------------------------------------- 8-6
Low Pressure Switch ------------------------------------------------ 9-4
Lubrication ------------------------------------------------------------ 7-5
Lubrication, Compressor ------------------------------------------- 7-5
Lubrication, Cutter Gear Reducer-------------------------------- 7-5
M
Machine Ratings (50 Hz., 15 HP) -------------------------------11-3
Machine Ratings (60 Hz., 10 HP) -------------------------------11-2
Machine Room -------------------------------------------------------- 2-2
Machine Won’t Run -------------------------------------------- 8-2, 8-3
Maintenance ----------------------------------------------------------- 7-1
Maintenance Program ---------------------------------------------- 7-4
Make-Up Water ------------------------------------------------------- 3-1
Manual Harvest Push Button-------------------------- 5-3, 5-5, 6-2
Metric Conversion ---------------------------------------------------11-9
Mechanical Cleaning ------------------------------------------ 7-4, 7-5
N
NEMA ------------------------------------------------------------------- 2-2
Nomenclature, Piping Schematic -------------------------------- 4-2
Non-Condensable Gases -----------------------------------------9-12
Normal Operating Vitals -------------------------------------------11-6
Note To Manager----------------------------------------------------- 7-5
O
Oil Pressure Safety Control---------------------------------------- 9-9
On/Off Switch ------------------------------------------- 5-3, 5-5, 6-2
Operating Tips -------------------------------------------------------- 5-5
Operation Vitals------------------------------------------------------11-6
Optional Equipment, Power Monitor ------------------------- 10-17
Optional Equipment, Soft-start Motor Controller ----------10-14
Overload, Cutter ------------------------------------------------------ 6-2
Overload, Pump------------------------------------------------------- 6-2
P
Pin, Stainless Steel ------------------------------------------------ 9-18
Piping and Drain Connections ------------------------------------ 3-1
Piping Schematic, Nomenclature -------------------------------- 4-2
Piping Schematic, Water cooled --------------------------------- 4-3
PLC -------------------------------------------------------------------- 10-2
Poor Ice Quality ------------------------------------------------------- 8-8
Power Connection---------------------------------------------------- 3-4
Power Monitor -----------------------------------------------------10-17
Preventive Maintenance -------------------------------------------- 7-6
Preventive Maintenance Program ------------------------------- 7-8
Preview------------------------------------------------------------------ 1-1
Principle of Operation ----------------------------------------------- 4-1
Programmable Logic Controller -------------------------------- 10-2
Pump Down ---------------------------------------------------------- 9-11
Pump Overload ------------------------------------------------------- 6-2
Pump, Contactor------------------------------------------------------ 6-2
Q
R
R-22 (HCFC-22) ------------------------------------------ 1-2, 2-1, 5-1
Receipt of Machine -------------------------------------------------- 2-1
Receiver ---------------------------------------------------------------- 4-1
Refrigerant Charge--------------------------------------------------- 5-1
Refrigerant Leaks -------------------------------------------------- 9-12
Refrigerant, Charge -------------------------------------------------- 5-1
Refrigerant, Leaks---------------------------------------------------- 5-1
Refrigerant, Removal ---------------------------------------------- 9-11
Refrigeration System Review ------------------------------------- 5-1
Rotation Check-------------------------------------------------------- 3-5
S
Safety Notice ---------------------------------------------------------- 1-2
Safety Symbols and What They Mean-------------------------- 1-3
Safety Valves ---------------------------------------------------------- 2-1
Shipping Papers ------------------------------------------------------ 2-1
Soft-start Motor Controllers -------------------------------------10-14
Solenoid Valve ------------------------------------------------------ 9-13
Space Diagram (Air-Cooled Machine) -------------------------- 3-3
Space Diagram (Water Cooled Machine) ---------------------- 3-2
Special Precautions-------------------------------------------------- 1-2
Start Push Button (PB1) -------------------------------- 5-3, 5-5, 6-2
Start-Up ----------------------------------------------------------------- 5-3
Start-Up Checklist ---------------------------------------------------- 5-2
Storage (prior to installation and start-up) --------------------- 2-2
Suction Cut-Off Unloader----------------------------------------- 9-14
Symptoms, Troubleshooting--------------------------------------- 8-1
T
Technical Service Bulletin(Water Quality) ------------------- 9-22
Telephone Number, Vogt------------------------------------------- 1-1
Temperature-Pressure Chart------------------------------------ 11-8
Thawing, Chamber --------------------------------------------------- 4-2
Summary of Contents for TUBE-ICE P-118F
Page 1: ...P 118F TUBE ICE MACHINE Service Manual 5000 1 6 09 ...
Page 4: ......
Page 6: ......
Page 14: ...P118F Service Manual INTRODUCTION 1 6 09 1 4 FIGURE 1 1 Assembly Air Cooled Front View ...
Page 15: ...P118F Service Manual INTRODUCTION 1 6 09 1 5 FIGURE 1 2 Assembly Air Cooled Rear View ...
Page 16: ...P118F Service Manual INTRODUCTION 1 6 09 1 6 FIGURE 1 3 Assembly Air Cooled Right Side View ...
Page 17: ...P118F Service Manual INTRODUCTION 1 6 09 1 7 FIGURE 1 4 Assembly Water Cooled Front View ...
Page 18: ...P118F Service Manual INTRODUCTION 1 6 09 1 8 FIGURE 1 5 Assembly Water Cooled Rear View ...
Page 19: ...P118F Service Manual INTRODUCTION 1 6 09 1 9 FIGURE 1 6 Assembly Water Cooled Right Side View ...
Page 20: ...P118F Service Manual INTRODUCTION 1 6 09 1 10 ...
Page 23: ...P118F Service Manual RECEIPT OF YOUR TUBE ICE MACHINE 1 6 09 2 3 ...
Page 37: ......
Page 38: ...1 6 09 ...
Page 48: ......
Page 49: ...1 6 09 ...
Page 88: ...P118F Service Manual SERVICE OPERATIONS 1 6 09 9 18 FIGURE 9 8 Cutter Water Tank Assembly ...
Page 89: ...P118F Service Manual SERVICE OPERATIONS 1 6 09 9 19 FIGURE 9 9 Cutter Tank Parts cylinder ice ...
Page 90: ...P118F Service Manual SERVICE OPERATIONS 1 6 09 9 20 FIGURE 9 10 Cutter Drive Parts ...
Page 102: ...P118F Service Manual TABLES CHARTS 1 6 09 11 1 11 Tables Charts ...
Page 111: ...P118F Service Manual TABLES CHARTS 1 6 09 11 10 ...