1624R, 2525 and 2550 Series 5 Installation
47
© 2019 Vision Engraving Systems
High Frequency Router Head Removal - continued
4. Loosen the four mounting screws and remove. The Router Head will be held in place on the Rail Plate
by the two Dowel Pins on the back of the Mounting Plate.
5. Using two hands, pull the Router Head away from the Rail Plate.
To Install the High Frequency Router Head, reverse this procedure.
2.9.3
NSK 50,000 RPM Spindle
The NSK Spindle mounts to the Router Rail Plate in the same location as other Router or Engraving
Head Assemblies. Two dowel pins are pressed into the Mounting Bracket Assembly and four mounting
screws secure the bracket to the rail plate.
Summary of Contents for 1624R
Page 1: ...2019 Vision Engraving Systems Vision 1624R 2525 and 2550 Series 5 User Guide Revised 7 3 2019...
Page 20: ...Vision Series 5 Controller User Manual 20 2019 Vision Engraving Systems 1624R Diagrams...
Page 21: ...1624R 2525 and 2550 Series 5 Installation 21 2019 Vision Engraving Systems...
Page 22: ...Vision Series 5 Controller User Manual 22 2019 Vision Engraving Systems...
Page 26: ...Vision Series 5 Controller User Manual 26 2019 Vision Engraving Systems 2525 2550 Diagrams...
Page 27: ...1624R 2525 and 2550 Series 5 Installation 27 2019 Vision Engraving Systems...
Page 37: ...1624R 2525 and 2550 Series 5 Installation 37 2019 Vision Engraving Systems...
Page 54: ...Vision Series 5 Controller User Manual 54 2019 Vision Engraving Systems...
Page 58: ...Vision Series 5 Controller User Manual 58 2019 Vision Engraving Systems...
Page 128: ...Vision Series 5 Controller User Manual 128 2019 Vision Engraving Systems...
Page 130: ...Vision Series 5 Controller User Manual 130 2019 Vision Engraving Systems...
Page 131: ......