70
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
19. Closing the heat pump; resetting the circuit breaker/
main fuse
•
•
•
20. Starting the heat pump
................................................... 83
•
21. Commissioning the system
........................................... 83
•
22. Ticking the heat pump type on the type plate of the
internal unit (as per external unit type plate)
•
•
•
23. Checking the heat pump for unusual noises (e.g.
operating noise of fan, compressor or pump); venting
again if required
•
•
•
24. Checking the system function (e.g. actuators,
temperatures, heat meter if applicable)
........................ 92
•
25. Instructing the system user
........................................... 93
Commissioning, inspection, maintenance
Steps - commissioning, inspection and…
(cont.)
5623 661 GB