39
2x
5.
5.
Flare the pipe bends on their open
end and secure connection piece
(twin nipple) with union nuts.
Note
■ Flare the pipe end of the hot gas
line by approx. 0.5 mm.
■ Connection pieces must not be
positioned diagonally. Check that
the flared connections are firmly
seated.
Installation sequence
Connecting refrigerant lines
(cont.)
5623 661 GB
Installation