3
Disposal of packaging ............................................................................
Product information ................................................................................
Requirements regarding on-site connections ........................................
Recommended power cables .............................................................
Installation information ........................................................................ 10
Minimum clearances ........................................................................... 11
Minimum clearances for heat pump cascade (max. 5 external units) 12
Transport and installation ................................................................... 12
Floorstanding installation .................................................................... 13
Installation room requirements ........................................................... 14
Minimum clearances ........................................................................... 14
Fitting the internal unit to the wall ....................................................... 15
Connecting refrigerant lines ................................................................... 15
Routing the refrigerant lines ............................................................... 16
Sound and vibration isolation when line entry is above ground level . 17
Connection to the external unit ........................................................... 18
Connection to the internal unit ............................................................ 19
Connecting the secondary circuit ........................................................... 21
Connecting a cooling circuit if required .................................................. 21
Electrical connection .............................................................................. 22
Internal unit: Routing the cables to the wiring chamber ...................... 23
Internal unit: Overview of connections ................................................ 24
Internal unit: Main PCB (function components 230 V~) ...................... 25
Internal unit: Luster terminals (signal and safety connections) ........... 29
Internal unit: Controller and sensor PCB (LV connections) ................ 30
Internal unit: AVI PCB ......................................................................... 33
External unit: Overview of connections .............................................. 33
Connecting internal and external units ............................................... 34
Heat pump control unit power supply 230 V~ ..................................... 35
External unit power supply 230 V~/400 V~ ........................................ 35
Power supply with power-OFF: Without on-site load disconnect ....... 37
Power supply with power-OFF: With on-site load disconnect ............ 38
Mains power supply in conjunction with on-site power consumption . 40
Closing the heat pump ........................................................................... 41
Fitting the front panel of the internal unit ............................................ 42
Fitting side cover for external unit ....................................................... 42
Steps - commissioning, inspection and maintenance ............................ 43
Overview of electrical components ........................................................ 60
Opening the programming unit .............................................................. 60
Placing the control panel in its service position ..................................... 61
Overview of internal components: Internal unit ...................................... 62
Index
Index
5700 542 GB