19
Tighten the nuts with the following torque:
Type AWB/
AWB-AC
Line
Connection to exter-
nal unit
Torque in Nm
201.B04
Liquid line
7
6 mm
⁷
⁄
₁₆
UNF
14 to 18
Hot gas line
7
12 mm
¾
UNF
50 to 62
201.B05
Liquid line
7
10 mm
⅝
UNF
33 to 42
Hot gas line
7
16 mm
⅞
UNF
63 to 77
201.B07
Liquid line
7
10 mm
⅝
UNF
33 to 42
Hot gas line
7
16 mm
⅞
UNF
63 to 77
201.B10
Liquid line
7
10 mm
⅝
UNF
33 to 42
Hot gas line
7
16 mm
⅞
UNF
63 to 77
201.B13
Liquid line
7
10 mm
⅝
UNF
33 to 42
Hot gas line
7
16 mm
⅞
UNF
63 to 77
201.C10
Liquid line
7
10 mm
⅝
UNF
33 to 42
Hot gas line
7
16 mm
⅞
UNF
63 to 77
201.C13
Liquid line
7
10 mm
⅝
UNF
33 to 42
Hot gas line
7
16 mm
⅞
UNF
63 to 77
201.C16
Liquid line
7
10 mm
⅝
UNF
33 to 42
Hot gas line
7
16 mm
⅞
UNF
63 to 77
Connection to the internal unit
2.
1.
3.
2x
D
C
D
C
D
C
Fig. 14
C
Liquid line
D
Hot gas line
Installation sequence
Connecting refrigerant lines
(cont.)
5700 542 GB
Installation