UPPER ROLL INSTALLATION – ALL
SIZES
1.
Prior to installation, clean all shaft surfaces
and roll bores to remove any dirt and scale.
2.
Inspect the roller bearing inside the upper
roll for proper lubrication and movement.
Inspect the roll guards for wear and
freedom of movement. Repair or replace
any damaged components, if neces sary.
3.
Slide the upper roll assembly carefully onto
the upper shaft with the red plate facing
out. Loosen the roll guards, if necessary, to
ease installation. Ensure that the red plate
engages the two pins on the arm and that
it contacts the front of the upper shaft.
4.
Insert the upper roll bolt, and tighten it
securely with a wrench.
5.
Lubricate upper roll bearing. Refer
to the “Main tenance” section for the
recommended lubricant.
TM-VE268_34
REV_H
TM-VE268
/ Operating and Maintenance Instructions Manual
Summary of Contents for VE268
Page 2: ......