
MVP3
SYSTEM BOARD
HARDWARE SETUP
3-1
3.
HARDWARE SETUP
This chapter explains how to configure the mainboard hardware. When you are
installing the mainboard, you will have to make jumper settings and cable
connections. Please refer to the following sections for the details:
3.1
UNPACKING
The system board package contains the following parts :
This system board.
Operation manual.
Cable set for IDE and I/O device.
One CD diskette which includes device driver and utility program
The mainboard contains electric sensitive components which can be easily damaged
by static electricity, please leave the mainboard sealed in its original packing until
when installation.
Unpacking and installation shall be done on a grounded anti-static mat. The operator
will have to wear an anti static wristband, grounded at the same point as the anti-
static mat.
Inspect the mainboard carton to see whether there is any obvious damage. Shipping
and handling may cause damage to your board. Be sure there is no shipping or
handling damages on the board before proceeding.
After opening the motherboard color box, extract the mainboard and place it only on
a grounded anti-static surface with the component side up. Inspect the board again to
see whether there is any damage.
Press on all of the socket IC‘s to make sure that they are properly seated. Do this
only with the board placed on a firm flat surface.