![Vess R2000 SERIES Product Manual Download Page 671](http://html.mh-extra.com/html/vess/r2000-series/r2000-series_product-manual_1008893671.webp)
644
Vess
R2000
Series
Product
Manual
Promise
Technologies
Reported
Event
Corrective Action
Battery
Battery is inserted
No action is required.
Battery charging has failed
Replace the battery.
Battery reconditioning has started
No action is required.
Battery reconditioning has been
terminated
Replace the battery.
The write policy of writeback logical drive
switched from writeback to writethru
Check the event log to see whether battery
is re-conditioning.
The write policy of writeback logical drive
switched from writethru to writeback
No action is required.
Battery is charging in high temperature
Monitor the condition. Contact Tech
Support if the problem persists.
Battery cannot function with the
enclosure or with the attached battery
board
Wrong battery installed. Contact Tech
Support for assistance.
Logical drive writeback cache maybe
enabled without battery support
No action required.
Battery is fully charged
Battery is not present
Install a battery or verify that the battery is
properly connected.
Battery is not accessible
Connect the battery properly or replace the
battery.
BBU
BBU flushing has started
No action is required.
BBU flushing has ended
BBU flushing has failed
Contact Tech Support if the condition
persists.
Summary of Contents for R2000 SERIES
Page 1: ...ProductManual ...
Page 2: ...Vess R2000 Series Product Manual Version 2 0 2014 PROMISE Technology Inc All Rights Reserved ...
Page 83: ...Vess R2600i with SAS JBOD expansion 56 Vess R2000 Series Product Manual Promise Technologies ...
Page 151: ...124 Vess R2000 Series Product Manual Promise Technologies Topology display ...
Page 302: ...275 Product Manual NAS Function and Management Redundancy with port configuration ...
Page 704: ... 2014 PROMISE Technology Inc All Rights Reserved ...