3 Parallel UPS Installation And Commissioning
3.4.2 Connecting Parallel Cables
3.4.3 Connecting Battery Cables
3.5 Commissioning Parallel System
3.5.2 Parallel System Parameters Setting
........................................................................................... 39
3.5.3 Power-On Commissioning For Parallel System
.......................................................................... 39
3.6 Installation And Commissioning For Dual Bus System
......................................................................... 41
3.6.2 Installing External Protective Device
......................................................................................... 42
3.6.5 Setting Parameters Of LBS