
Ver
sion:
M
P4/
6 G
3
08/
01
/2024
15
Check the water pressure
Check the water pressure while the boiler is cold.
11.
Refer to the installation engineer’s note regarding the set pre-charge
pressure on page 4.
-
If the pressure is less than 0.2 bar above the pre-charge pressure,
add water to the pipe system via the filling valve.
-
If the filling valve is missing, contact your installation engineer.
If you would like help adjusting the water pressure, please contact your
installation engineer.
Empty the drain water tank
12.
Remove the drain water tank.
13.
Empty the water that has accumulated in the drain water tank.
14.
Reinstall the drain water tank.
Install the cover
15.
Using both hands, firmly grasp the locking mechanism on the sides of the cover.
16.
Hook the cover onto the top of the boiler.
17.
Carefully press the cover downwards and inwards until the cover is installed.