
Ver
sion:
M
P4/
6 G
3
08/
01
/2024
13
Warnings
The boiler will start up again if the reason for the warning ceases, but the warning will remain on the
display until you have acknowledged the warning.
When a warning has been activated, the boiler will perform the following actions:
-
The boiler temporarily stops operating.
-
Yellow indicator light flashes.
-
The display shows a warning triangle and a warning bell with a black background.
Limitations
When the boiler reaches a set value, the boiler activates a limitation and temporarily stops heating.
Limitations do not require any action to be taken.
-
Green indicator light flashes.
-
The display shows a warning bell with a light background.
Press the button below the alarm bell to see which limitation the boiler
has activated.
Activity log
The boiler saves operational information in an activity log. The installation engineer can use this
information for troubleshooting and to make adjustments.
2.5.
Maintenance
In order for the boiler to deliver optimal output and enjoy as long a service life as possible,
you need to maintain the boiler.
If the vent valve or safety valve is not working properly, turn off
the boiler immediately with the power switch and contact your
installation engineer for troubleshooting and remedial actions.
Please read all the instructions before starting maintenance work!
Maintain the boiler every six months:
-
Check the vent valve
-
Check the safety valve
-
Check the water pressure
-
Emptying the drain water tank
Proceed as follows:
Remove the cover
1.
Using both hands, grasp the locking mechanism
on the sides of the cover.
2.
Pull the cover carefully towards you.
3.
Lift the cover upwards to unhook it.
4.
Place the cover where it is not at risk of being damaged.