installation
vacon
•
11
24-hour s358 (0)201 212 575 • Email: [email protected]
2
Figure 16: Install the control cables (MI1 - MI3)
Figure 17: Install the control cables (MI4 - MI5)
Strip the plastic
cable coating for
360
°
earthing
Control cable
tightening
torque: 0.4 Nm