OPERATION
6.1
Overview
6.1.1
Introduction : Operation Modes
6.2
Startup Preparation
6.2.1
Start-up Preparation Sequence in LOCAL Mode
6.2.2
Start-up Preparation Sequence in logic interface
6.2.3
Start-up Preparation Sequence in RS-485 communication
6.3
Start-up
6.3.1
Start-up Sequence in LOCAL Mode
6.3.2
Start-up Sequence in logic interface
6.3.3
Start-up Sequence in RS-485 communication
6.4
Shutting Down
6.4.1
Preparations Prior to Shutting Down Operation
6.4.2
Shutting Down Sequence in LOCAL Mode
6.4.3
Shutting Down Sequence in logic interface
6.4.4
Shutting Down Sequence in RS-485 communication
6.5
Variable Speed Operation
6.5.1
Outline
6.5.2
Operation from Start-up to Low Speed Rotation
6.5.3
Operation From Rated Speed Rotation to Low Speed Rotation
6.5.4
Operation from Low Speed Rotation to Rated Speed Rotation
6.6
Software Operation
6.7
Interface Connector
6.7.1
Specification
6.7.2
Pin Assignment
6.7.3
Connector
6.7.4
Setting for Interface Connector Operation
6.7.5
Delay Venting Mode
6.8
RS-485 Communication Specifications
6.8.1
Transfer Specifications
6.8.2
CABLE
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
6
Summary of Contents for UTM300B
Page 8: ...vii Location of label...
Page 11: ...x This page is intentionally left blank...
Page 17: ...xvi Table of contents This page is intentionally left blank...
Page 51: ...34 SECTION 5 INSTALLATION This page is intentionally left blank...
Page 70: ...GAS PURGE 7...
Page 77: ...60 SECTION 8 TURBO MOLECULAR PUMP RECONDITION This page is intentionally left blank...
Page 111: ...A 26 Appendix A COMMUNICATIONS This page is intentionally left blank...