-15-
Terminal plate (2pcs)
Terminal Block
Electric Source
Terminal M4 Nut
Earth Terminal
M5 Bolt
200V Connection
(Factory setting)
100V Connection
How to wire
①
Remove 4pcs. of M5 bolt at motor terminal box and remove protection cover.
※
Be sure to keep M5 bolts and washer, which were removed from the protection
cover.
②
Wiring diagram is shown inside protection cover.
③
Please tighten a terminal plate and a cable with the nut
of the top and bottom from the terminal surface at about
5mm positions like a figure.
You can change to a 100V or 200V connection by changing terminal plate (2pcs.).
※
It is wired to 200V when shipping from factory.
④
If you want to change to a 100V connection, remove M4 nut of electric source
terminal and change terminal plate as illustrated below.
⑤
Connect electric cable to terminal by using cable-gland at
φ
22mm hole of motor
terminal box.
⑥
Insert electric source cable through cable-gland on the bottom side of terminal
box.
⑦
Connect each phase L-N to each electric source terminal respectively in
accordance with the below wiring diagram.
Terminal screw nuts should be torqued between 1.2 N
・
m and 1.5N
・
m.
⑧
The protective earth cord shall be suffice in length and put up to keep the cord the
last to take the strain if the cable slips in its anchorage.
Summary of Contents for DIS-90
Page 28: ...27 8 2 Dimensions...
Page 29: ...28 8 3 Performance data Inlet Pressure Pa Pumping Speed L min...
Page 30: ...29 Memo...