409-10083
AMP 3K andAMP 5K Terminating Machines with the SL Starlite CQM
Rev E
10 of 38
Tyco Electronics Corporation
Figure 8
Machine
Guard
Shown with Safety Interlock
(Not on Machines -18, -22,
-24 and -25)
Hole for Customer
Supplied Lift Ring
Quick-Release T-Handle for
Machines -15, -16, -19, -20,
-23, and -24
Shown with Optional
Precision Crimp Height
Adjustment Mechanism
3. RECEIVING INSPECTION AND INSTALLATION
3.1. Receiving Inspection
These machines are thoroughly inspected during and after assembly. A final series of inspections is made to
insure the proper machine functioning before packaging and shipping.
To protect against damage that may have occurred during shipment, remove the machine from the crate
(Paragraph 3.2) and carefully inspect the machine for damage. If damage is evident, file a claim against the
carrier and notify Tyco Electronics immediately.
3.2. Installation
Remove all mounting bolts securing the machine to the shipping pallet. Install lift ring (see Figure 8) on top of
the machine.
Lift ring (M1220 eye bolt) is customer supplied.
Install the lift ring carefully. A 19.05-mm [.75-in.] thread length engagement is required for the lift ring to support the
machine.
Attach a suitable hoist to the lift ring, lift the machine, and place it in the selected operating location.
Insert the reel support post into the appropriate hole on top of the machine (Figure 7) until the roll pin engages
a groove in the machine frame.
NOTE
i
CAUTION
!