9
Index
A
Adjusting multileaf dampers....................................... 61
AHU casing units
Applying sealing tape............................................ 35
Assembling AHU casing units for outdoor
installation............................................................. 35
Assembling the roof segments.............................. 35
Assembly............................................................... 24
Cover strips for the intermediate frame, fixing...... 37
Fitting base frame plugs........................................ 37
Installing ducts...................................................... 38
Installing the noise insulating connector............... 26
Joining with screws/bolts....................................... 24
Screw-fixing stacked units..................................... 24
Setup..................................................................... 23
Stacked installation............................................... 24
AHU components
Seals, checking..................................................... 22
Air handling unit
Commissioning...................................................... 55
Electrical connection............................................. 46
Installing accessories............................................ 38
Applying sealing tape................................................. 35
Assembling the roof segments............................. 35, 36
Assembly
Accessories........................................................... 38
AHU casing units for outdoor installation.............. 35
Assembling AHU casing units............................... 24
Ducts..................................................................... 38
Installing AHU casing units on top of each other.. 24
Intermediate frame, fixing the cover strips............ 37
Plate heat exchanger............................................ 28
Roof segments...................................................... 35
Weather hood........................................................ 36
Attaching the weather hood....................................... 36
B
Bus cable................................................................... 46
C
Commissioning the centrifugal fan............................. 57
Commissioning the humidifier.................................... 64
Condensate drain....................................................... 42
Connecting a drain trap.............................................. 42
Cooling coil
Commissioning...................................................... 59
Installing................................................................ 42
Copyright...................................................................... 3
D
Daisy chain................................................................. 46
Defects liability............................................................. 3
Delivery of the air handling unit.................................... 9
Disposing of packaging.............................................. 18
E
Electric air heater
Commissioning...................................................... 60
Electrical connection.................................................. 46
Environmental protection
Chemicals............................................................. 67
Electrical and electronic components.................... 67
F
Filters, inserting.......................................................... 58
Fitting base frame plugs............................................. 37
H
Heating coil
Commissioning...................................................... 59
Installing................................................................ 42
Height of drain trap..................................................... 40
Hotline.......................................................................... 3
Hydraulic unit............................................................. 44
I
Improper transport equipment.................................... 10
Initial commissioning.................................................. 55
Adjusting inspection access doors........................ 55
Centrifugal fan....................................................... 57
Electric air heater.................................................. 60
Filters.................................................................... 58
Heating coil/cooling coil......................................... 59
Humidifier.............................................................. 64
Multileaf dampers.................................................. 61
Plate heat exchanger............................................ 63
Rotary heat exchanger.......................................... 62
Run around coil system................................... 60, 61
Sound attenuator................................................... 62
Starting.................................................................. 65
Inspection access doors
Leakage................................................................ 55
Installation
Condensate drain.................................................. 42
Connecting a drain trap......................................... 42
Connecting the heating coil/cooling coil................ 42
Connecting to the network.................................... 47
Connection to the central BMS............................. 47
Height of drain trap................................................ 40
Run around coil system......................................... 43
Installation location, requirements
Installation room.................................................... 21
Index
Air handling unit X-CUBE
69