Transport and storage
3.1 Delivery of the air handling unit
3.1.1 Complete and partial units
Upon delivery, check the air handling unit for transport
damage and completeness,
Depending on its size, the air handling unit is shipped
either fully assembled or in parts, with the individual
components or casing units screw-fixed to square edge
timber frames or disposable pallets.
The number of parts is shown on a drawing on the
package.
External components may be shipped unassembled
to protect them from getting entangled with transport
slings while being moved. These components have
to be properly installed and sealed by others.
3.1.2 Symbols on the packaging
The packaging carries the following marks and symbols.
Be sure to follow them when you are moving the unit.
The packaging may also carry other symbols, notes,
and information. These must also be followed.
Accessories
Fig. 2: Accessories
Packages with this sticker contain AHU accessories.
3.2 Delivery check
Check delivered items immediately after arrival for
transport damage and completeness. In case of any
damage or an incomplete shipment, contact the ship-
ping company and your supplier immediately. If any
parts are missing, have the driver confirm them on the
consignment note.
Otherwise the manufacturer will not accept any liability.
See the notes on shipping damage on the packaging
or in the shipping papers.
For any claims it is necessary that you follow the proce-
dure below. In each of the following cases do contact
TROX before you start installing a unit.
The packaging has been damaged
Unpack the goods in the presence of the person
who has delivered the goods and have them confirm
the damage on the shipping order.
Photograph the damage.
Report the damage to TROX immediately.
No external damage to packaging, contents dam-
aged.
Photograph the damage.
Report the damage to TROX immediately in writing.
Note that shipping damage must be reported within
four days of delivery.
Transport and storage
Delivery check