vi
TABLE OF CONTENTS
CHAPTER 10 - START-UP PREPARATION ........................................................................55
10.1. Boiler System Fluid Requirements ............................................................................................. 55
10.1.1 Boiler Fluid pH Level 6.0 to 8.0 ..........................................................................................55
10.1.2 Boiler Fluid Hardness Less Than 7 Grains .........................................................................55
10.1.3 Chlorinated Water ...............................................................................................................55
10.1.4 Flush Boiler to Remove Sediment ......................................................................................55
10.1.5 Cleaning of Old Boiler/System: .........................................................................................55
10.1.6 Cleaning of New Boiler/System: .......................................................................................55
10.1.7 Check and Test Antifreeze ................................................................................................. 56
10.1.8 Use of Antifreeze in the Boiler System ............................................................................. 56
10.2. Filling the Boiler System .............................................................................................................. 56
10.3. Check Low Water Cut-Off Device ................................................................................................ 56
10.4. Check For Gas Leaks ....................................................................................................................57
10.5. Check Thermostat Circuit ............................................................................................................57
10.6. Inspect Condensate Drain Assembly ..........................................................................................57
CHAPTER 11 - START-UP PROCEDURES .........................................................................59
11.1. Final Checks Before Start-Up ...................................................................................................... 59
11.2. PRESTIGE Solo Start-Up ............................................................................................................. 59
11.3. Check the PRESTIGE Solo and System ...................................................................................... 59
11.3.1 Check Boiler Piping. ............................................................................................................59
11.3.2 Check Vent and Combustion Air Piping.............................................................................59
11.3.3 Verify Carbon Monoxide Detector .....................................................................................59
11.3.4 Check Gas Piping ................................................................................................................ 60
11.3.5 Verify Flame Pattern and Combustion ............................................................................. 60
11.3.6 Measure Input - Natural Gas Only ...................................................................................... 61
11.3.7 Test High Temperature Limit .............................................................................................. 61
CHAPTER 12 - OUTDOOR RESET CONTROL ...................................................................63
12.1. Mounting the Outdoor Sensor .................................................................................................... 63
12.2. Wiring the Sensor ......................................................................................................................... 63
CHAPTER 13 - EXTERNAL MODULATING CONTROL .....................................................65
13.1. Wiring the Modulating Controller ................................................................................................ 65
13.2. ACVMax Programming ................................................................................................................ 65
13.3. Programming of External Modulating Control........................................................................... 65
CHAPTER 14 - CHECK-OUT PROCEDURES .....................................................................67
CHAPTER 15 - INSTALLATION RECORD ..........................................................................69
Summary of Contents for PRESTIGE Solo PA 110
Page 2: ...INTENTIONALLY LEFT BLANK...
Page 10: ...INTENTIONALLY LEFT BLANK...
Page 22: ...INTENTIONALLY LEFT BLANK...
Page 36: ...INTENTIONALLY LEFT BLANK...
Page 44: ...INTENTIONALLY LEFT BLANK...
Page 52: ...INTENTIONALLY LEFT BLANK...
Page 74: ...INTENTIONALLY LEFT BLANK...
Page 76: ...INTENTIONALLY LEFT BLANK...
Page 80: ...INTENTIONALLY LEFT BLANK...
Page 82: ...INTENTIONALLY LEFT BLANK...
Page 84: ...INTENTIONALLY LEFT BLANK...
Page 111: ......