L U B R I CATION SYSTEM
-
Oil
Cooler and Relief Valve
4.
I N STALL RELIEF VALVE
LU-1 9
In s t a ll the
relief
valve and s
pf
i
ng with
a
new gasket and
the plug.
Torque:
600
kg-em 136 ft-lb. 49 N ' m)
5.
I N STALL a l l FILTER (See page
LU -4)
6.
I N STAll I N J ECTION PUMP
ISee pages FU·98 and 99)
7 .
(2H MiT (wi EDIC SYSTEMI)
INSTALL EDIC MOTOR
8.
(2H MiT (w/o EDIC SYSTEM I)
I N STALL OVERI N J ECTION M A G N E T
9.
I N STAll AUTOMATIC T I M E R I S e e p a g e fU-2Sl
1 0. INSTALL TIMING GEAR COVER A N D C R A N K S H A FT
PULLEY
ISee steps 12 to
14
on pages EM·91 and 92)
1 1 .
INSTALL WATER P U M P PULLEY AND FAN
(See page CO-1
0)
1 2. I N STALL AND A D J U S T DRIVE BELT
ISee page CH -Sl
1 3. FILL WITH E N G I N E COOLANT (See page CO-3)
1 4. START E N G I N E A N D CHECK FOR LEAKS
1 5 .
CHECK E N G I N E a l l lEVEL (See page L
U
-31