E M ·44
E N G I N E MECHANICAL
Turbocharger
1 1 2H-
Tl
3.
I N STALL OIL PIPE
Install a new gasket and t h e oil pipe with new two n u t s . Do
not torque the nuts yet.
4.
INSTALL TURBOCHARGER
la) Install new twO gask.ets to the cylinder block and
exha ust manifold .
(bl
Install t h e t urbocharge r and o i l pipe together.
Ie)
Install the four nuts holding the turboc harger to t h e
e x h a u s t manifold.
Torq u e : 630 kg-em t38
ft-Ib,
52 N·m)
(d) Install new IWO nuts holding the oil pipe to the
cylinder block. Torque t h e four oil pipe nuts.
Torq u e :
1 86 kg-em (1 3
H·lb.
18 N · m)
leI
Install new two gaskets and t h e union bolt
of
the oil
pipe. Torque the union boll.
Torque: 250 kg-em (1 8
I t - l b .
2 5 N · m)
5.
INSTALL N O . 1 WATER BY·PASS PIPE
(a) InSlall a new gasket and t h e by- pass pipe wilh Ihe
Iwo fluls and two bolts.
Torqu e :
Nut
75 k g - e m
(65
i n . - Ib, 7 . 1 N · m)
Bolt 1 7 5
kg-em
( 1 3 ft-Ib, 1 7 N · ml
(b)
Install the union nul.