![Toyota 12H-T Repair Manual Download Page 261](http://html.mh-extra.com/html/toyota/12h-t/12h-t_repair-manual_1143167261.webp)
LU-22
L U B R ICATION SYSTEM
-
Oil
Nozzles and
Check V a l v e s
1 1 2 H -
T l
I N STALLATI ON O F OIL NOZZLES A N D
C H E C K VALVES
( S e e p a g e lU -201
1.
INSTALL O I L NOZZLES A N D CHECK VALVES
(a) Align the pin of
the
o i l nozzle with t h e
pin hole
of the
cylinder block.
(bl
I nstall
the
oil
nozzles and
check valves. T o rque
the
check valve.
Torq u e : 275 kg-em 120 I t · l b .
2 7
N ' m)
2.
INSTALL STIFFE N I N G PLATE A N D O I L PAN
(See steps 2
to
4
on
pages L U - 1 2 and 1 3)
3.
F i l L WITH E N G I N E O i l (See page L U - 4J
-4.
START E N G I N E CHECK FOR L E A K S
5.
R E C H E C K E N G I N E O I L lEVEL ( S e e p a g e lU-3J
..,