FUEL SYSTEM
-
Injection Pump
FU-B5
�
IBI
( 1 2)
O I l
�
,i'
,
Ii)
Apply liquid sealer on the threads and under I h e
screw p l u g heads.
fj)
Install the two screw plugs,
Torque: 1 20
k
g
-c
m (9 ft-Ib. 1 2 N·ml
(kl Inslall a new O�ring and Ihe cover plate with the IwO
bolts.
Torque:
86
kg�cm (74
In.-lb. 8.3 N·ml
1 6.
ASSEMBLE F U L L -LOAD STO PPER H O U S I N G
[ 2 H )
NOTE: U s e I h e springs indicated · 'A".
"
S
" ,
a n d
"C
Assemble the following parts:
(1 )
Sliding plate
(21
No.
1
adapter screw, bushing and
"8"
spring
(3)
Lock nut
(4)
Full slop cam
(5)
No. 2 adaptor screw, "A" spring and two lock
nuts
(6)
Connecting pin. thrust washer and E- ring
Check the thrust clearance o f the full stop cam.
(See page
FU·401
Thru s t
clearance:
0.03 - 0.08
mm
(0.00 1 2 - 0.0032 in.)
(7)
"C"
spring and f u l l - load stopper housing
lSI
Sliding plate s h a f l
( 9 )
Screw plug
Apply liquid sealer on the threads and under Ihe
screw plug head
( 1 0)
Stopper screw
( 1 1 )
New gasket and nut
1 1 21
New gasket and cap nul