www.toyorobot.com
34
5-1 Inspection and maintenance frequency
Inspection
:●
Maintenance
:◎
Parts
Daily Every
three
month
Every
six
month
Every
twelve
month
Check points
Trouble shoot
Cables,
power or
signal
●
●
Checking if there
are any part of the
cable is damaged.
●
Replacement
required if
damaged.
Ball
screw or
bearing
●
●◎
●◎
●◎
●
Checking if there
is any abnormal
vibration or noise.
◎
Recommended grease:
AFEP2 or NSK LG-2
●
If there are
dirt on the rail,
remove and re-
apply grease.
●
Make sure there
are enough grease
on the parts.
Dust
proof
plate
●
●
●
●
●
Check if there is
any damage
●
Check if it is
loose.
●
Replacement is
required if it
effects
functionality
●
Re-adjust the
plate if any part
of it is loose.
Linear
rail
●
●◎
●◎
●◎
●
Check if the screw
fixing the rails has
gone loose.
Please refer to
【
Table 3
】
various
parts of screw torque
values chart.
●
Check if there are
noises while slide is
moving.
◎
Recommended grease:
AFEP2 or NSK LG-2
●
Tighten if
loose.
●
If there are
dirt on the rail,
remove and re-
apply grease.
●
Make sure there
are enough grease
on the parts.