www.toyorobot.com
31
4-4 Installation.
The procedure for installation as follow:
a)
Check screw position on installation surface matches the ones on unit, please
refer to the specification sheet.
b)
Remove the side cover or the top cover of the unit.
c)
Move the carriage to ensure all screws are installed.
d)
Tighten all screws to install the unit.