No.
Part name
Procedure
Remarks
High
pressure
switch
1. Detachment
1) Recover the refrigerant gas.
2) Carry out works of 1 of
1
.
3) Remove the inverter cover.
Remove screws between the inverter
cover and the inverter box.
(ST1T Ø4 × 10, 2 pcs)
4) Cut the bundling bands that fixate high
pressure switch lead line.
5) Remove the connector for high pressure
switch from the inverter.
6) Remove the High pressure switch.
∗
Cautions when assembling the high
pressure switch
∗
Tighten the high pressure switch with
11±1N•m.
∗
Tightening work must use two
spanners.
Inverter
Cut the bundling band
High pressure switch connector
9
High pressure switch
Cut the bundling band
- 74 -
FILE NO. SVM-17005