No.
Part name
Exchange of
electric parts
(Continued)
Procedure
2. Reactor
1) Carry out works of 1 of
1
and
3
.
2) Remove the relay connector connected to
the control P.C. board.
Remarks
3) Remove each reactor.
(Truss B tight screw Ø4 × 6, 2 pcs. each)
4) Attach a new reactor.
Reactor relay connector
(Connected to lead wire
(White) at P.C. board side)
5
Screws
- 68 -
FILE NO. SVM-17005