![Toshiba e-STUDIO165 Service Manual Download Page 171](http://html.mh-extra.com/html/toshiba/e-studio165/e-studio165_service-manual_424116171.webp)
© 2006 - 2008 TOSHIBA TEC CORPORATION All rights reserved
e-STUDIO165/167/205/207/237
ADJUSTMENT
3 - 33
3
3.6
Adjustment of High-Voltage Transformer
When replacing the high-voltage transformer, checking each output adjustment of main charger, devel-
oper bias, transfer charger and separation charger is needed.
3.6.1
Adjustment
[ 1 ] Preparation
Items to check
Developer Bias
Main Charger
Transfer
Charger
Separation
Charger
Process Unit
Take off from the equipment. (Not used)
High-Voltage Transformer Jig Install the high-voltage transformer jig in the equipment.
Note:
Note:
Connect the green cable of the high-voltage transformer jig to ground on
the equipment frame. Refer to
P. 3-34 "[A] Installation of the high-volt-
age transformer jig".
Digital
Tester
(+) terminal
Connect with the black
cable of the high-volt-
age transformer jig.
Connect with the red
cable (thick line) of the
high-voltage trans-
former jig.
Connect with the red cable
(thin line) of the high-voltage
transformer jig.
(–) terminal
Connect with the white cable of the high-voltage transformer jig.
Function switch
DC
Full-scale (range)
1000 V
2 V
Remarks
Use a digital tester with an input resistance of 10 M
Ω
(RMS value) or higher.
How to turn ON the power
Attach the door switch jig and start with the adjustment mode [05] while the front
cover opened. Then press the front cover opening/closing switch.
Note
Refer to
P. 3-36 "[B]
Connection for devel-
oper bias adjustment".
Refer to
P. 3-36
"[C] Connection for
main charger adjust-
ment".
Refer to
P. 3-37 "[D] Con-
nection for transfer/separation
charger adjustment".
Summary of Contents for e-STUDIO165
Page 8: ...e STUDIO165 167 205 207 237 2006 2008 TOSHIBA TEC CORPORATION All rights reserved CONTENTS 4 ...
Page 10: ......
Page 312: ......
Page 313: ......