Installing the Jackstands
Lifting equipment capacity:
408 kg (900 lb)
1.
Align the front jackstand with the jackstand
receiver at the front of the tank (
g028422
Figure 130
1.
Clevis pin (1/2 x 3 inch)
4.
Hairpin (5/32 x 2-5/8
inches)
2.
Jackstand receiver
5.
Front jackstand
3.
Lock knob
2.
Insert the jackstand into the receiver until the
middle hole in the horizontal jackstand tube is
aligned with the hole in the top of the receiver
(
).
3.
Insert the clevis pin (1/2 x 3 inches) into the
holes in the jackstand and receiver and secure
the clevis pin with a hairpin (5/32 x 2-5/8 inches).
4.
Thread a lock knob into the receiver and tighten
the knob by hand (
).
5.
Align the rear jackstand with the rear jackstand
receiver (
g028423
Figure 131
1.
Hairpin (5/32 x 2-5/8
inches)
3.
Jackstand receiver
2.
Clevis pin (1/2 x 4-1/2
inches)
4.
Rear jackstand
6.
Align the hole in the top of the jackstand with the
hole in the frame of the tank skid (
)
7.
Secure the jackstand to the receiver and the
frame with 2 clevis pins (1/2 x 4-1/2 inches) and
2 hairpins (5/32 x 2-5/8 inches) as shown in
8.
Repeat steps
through
for the front and rear
jackstands at the other side of the tank skid.
88
Summary of Contents for Multi Pro WM
Page 91: ...Schematics g209531 Flow Diagram Sprayer System Rev B 91...
Page 92: ...Notes...
Page 93: ...Notes...
Page 94: ...Notes...