g002014
Figure 63
Right Boom
1.
Grease fitting
3.
Wipe off excess grease.
4.
Repeat the procedure for each boom pivot.
Greasing the Actuator-Rod
Bearings
Service Interval:
Every 400 hours/Yearly (whichever
comes first)
Grease Type:
No. 2 lithium grease.
1.
Extend the booms to the
SPRAY
position.
2.
Remove the cotter pin from the pivot pin (
3.
Lift up on the boom and remove the pin and
slowly lower the boom to the ground (
).
4.
Inspect the pin for any damage, replace if
necessary.
g013780
Figure 64
1.
Actuator
4.
Cotter
2.
Actuator rod
5.
Pin
3.
Boom-pivot-pin housing
5.
Manipulate the actuator-rod-bearing end and
apply grease into the bearing (
Note:
Wipe off excess grease.
g002015
Figure 65
Right Boom
1.
Grease bearing
6.
Lift up on the boom to align the pivot with the
actuator rod.
7.
While holding the boom, insert the pin through
both boom pivot and actuator rod (
8.
With the pin in place, release the boom
and secure the pin with the cotter removed
previously.
53
Summary of Contents for Multi Pro ExcelaRate 5800-G
Page 73: ...Spray System Schematic g034336 Figure 92 73...
Page 86: ...Notes...
Page 87: ...Notes...