30. Loosen the pressure hose fitting at the pump and
rotate the fitting 45 degrees toward the rear of the
machine (Figure 86).
Note:
Figure 86 is shown as viewed from under
the traction unit.
Figure 86
1.
Pump
2.
Pressure hosed fitting
(rotated 45 degrees)
31. Roll the summer deck and frame into position
and install the five 3/4" bolts, washers and nuts
that connect the deck frame to the rear frame
(Figure 87). Remove the lift cylinder pins and rear
drive tires (if required) to gain access to the bolts on
the right hand side. Torque the bolts to 265 foot
pounds.
Figure 87
1.
3 mounting bolts (3/4 inch), washers and nuts (Left side)
32. Remove the clevis pins and a 5/16" self-tapping
screw pin retainers securing the vertical tube
support assemblies to the rear of the deck frame
(Figure 88).
Figure 88
1.
Deck frame
3.
Clevis pin & screw pin
retainer
2.
Vertical tube support
33. Pivot open the floor plate (Figure 89).
Figure 89
1.
Floor plate
34. Slide the drive shaft onto the gearbox shaft
(Figure 90). Install the roll pin and torque the bolts
to 175-225 inch pounds.
33