20. Install the new dual contact switch to the right side
of the engine thermostat housing (Figure 24).
Figure 24
1.
Dual contact switch
2.
Wire from old left switch
21. Secure the wire, previously connected to the right
side switch, to the male spade terminal.
22. Connect the wire, previously connected to the left
side switch, to the lead on the new switch.
3
Preparing the Electrical
System
Parts needed for this procedure:
1
Cab harness
1
Fusible link
2
Cable tie
4
Cable tie (supplied with cab model 30371)
Procedure
Route and secure the cab harness and fusible link as
follows:
1. Insert the wires from the large harness connector
down thru the right grommet in the rear frame
mount (Figure 25).
Figure 25
1.
Rear frame mount
3.
Harness connector
2.
Grommet
4.
Connector cap
2. Unlatch the control panel cover and lay it to the side
(Figure 26).
Figure 26
1.
Control panel cover
2.
Latches
3. From the same end of the harness as the large
connector, route the long cab wire (with two
connectors), down the ROPS post, under the rear
panel frame member and up through the hole in the
bottom of the control panel (Figure 27). Secure the
long wire to the lower ROPS post with a cable tie.
14