![Tianlong Gentier 48E User Manual Download Page 27](http://html.mh-extra.com/html/tianlong/gentier-48e/gentier-48e_user-manual_1114100027.webp)
13
Gentier Real-Time PCR System
C. The Preparation before Experiment
1. Instrument Self Inspection
The Gentier instrument possesses self-inspection function, it is recommended to let the
instrument conduct the self-inspection before running any experiment, to ensure that it can work
normally.
1
st
Step
:
switch on the power switch of Gentier instrument.
2
nd
Step
:
Gentier instrument will automatically conduct the self-inspection after power on, which
will inspect instrument version, whether electric system is in normal working state,
whether power supply is normal and query initialize motor positions, etc.
3
rd
Step
:
after the self-inspection, the Gentier instrument will enter the standby state.
Caution
:
before power on the Gentier instrument, please ensure:
The external devices of the Gentier instrument are properly connected.
The power supply of Gentier instrument is properly connected.
Caution:
in case the
Gentier instrument fails to pass the self-inspection, do not slap or shake
it, please contact the distributor or
XATL Co., LTD.
2. Reagent Preparation
1
st
Step:
please follow the operation instructions of PCR kit to prepare the PCR reagent.
2
nd
Step:
please add the sample and PCR reagent into the suitable consumables, if needed, please
seal the consumables .
3. Instrument Loading
1
st
Step
:
please hold the top lid handle to lift up and open the top lid, the sample block will be
present in front of the user.
2
nd
Step
:
place the cosumables that contain the sample and PCR reagent mixture on the sample
block and close the top lid.
3
rd
Step
:
select or edit an experiment program and then start running.
Summary of Contents for Gentier 48E
Page 14: ......