
Handling and operation
0
8/41
6
Handling and operation
When a linear drive unit is operated with only short travel (<100mm) always at the same
place, sufficient lubrication is not ensured. In this case, carry out a movement over the entire
range of movement at regular intervals, after about 250 to 500 double travels.
During operation, occasionally check the correct function of the linear drive unit by visual
inspection.
The operating and supervisory staff are duty bound to inspect the linear drive units or system
for outwardly visible damage or faults at least once a shift. Any changes (including changes in
the operating behaviour) that could affect safety must be reported at once.
7 Faulty
operation
In the case of faulty operation, the operating sequence must be inspected by experts, and if
necessary commissioning must be repeated. Pay special attention to the notes in Chapter 5
"Commissioning" to avoid injury and damage.
56
WIESEL
POWER
Line
®
Summary of Contents for WIESEL POWERLine WM120
Page 28: ...Wartung 08 41 Bild 15 Abdeckband wechseln 26 WIESEL POWERLine...
Page 62: ...Maintenance 08 41 Fig 15 Replacing the cover strip 60 WIESEL POWERLine...
Page 96: ...Maintenance 08 41 Figure 15 Remplacement de la bande de recouvrement 94 WIESEL POWERLine...
Page 130: ...Manutenzione 08 41 Fig 15 Sostituzione della bandella di protezione 128 WIESEL POWERLine...
Page 139: ...09 41 WIESEL POWERLine 137...
Page 142: ...08 41 12 2 WIESEL POWERLine WM60 WM80 WM120 140 WIESEL POWERLine...
Page 144: ...08 41 12 3 WIESEL POWERLine WM60 370 WM80 370 142 WIESEL POWERLine...
Page 146: ...08 41 12 4 WIESEL POWERLine WV60 WV80 WV120 144 WIESEL POWERLine...