![ThermoFisher Scientific Ozone Primary Standard 49iQPS Instruction Manual Download Page 189](http://html1.mh-extra.com/html/thermofisher-scientific/ozone-primary-standard-49iqps/ozone-primary-standard-49iqps_instruction-manual_1105615189.webp)
Servicing
49iQPS Photometer DMC
Thermo Scientific
49iQPS Instruction Manual
6-33
Use the following procedure to replace the board.
Equipment required:
Phillips drive, #2
1.
Unplug electrical, detector 1, detector 2, thermistor, and heater.
2.
Using a #2 Phillips drive, unfasten five 6-32 pan head screws.
Figure 6–39.
Photometer Board Replacement
3.
Replace board and reassemble in reverse order.
Photometer DMC
Board Replacement
Summary of Contents for Ozone Primary Standard 49iQPS
Page 1: ...49iQPS Instruction Manual Ozone Primary Standard 117434 00 1Apr2020...
Page 2: ......
Page 8: ......
Page 31: ...Operation Instrument Display Thermo Scientific 49iQPS Instruction Manual 3 7...
Page 142: ......
Page 208: ......
Page 216: ......
Page 234: ......
Page 242: ......
Page 254: ......
Page 255: ......